Scholarly Research Excellence
%0 Journal Article
%A Takayuki Nanashima and  Yoshiyuki Higuchi and  Masao Ohta and  Takashi Kuroda
%D 2013 
%J  International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering
%B World Academy of Science, Engineering and Technology
%I International Science Index 73, 2013
%T Case Study of Bus Tourist-s Sightseeing Time in a New Sightseeing Spot
%U http://waset.org/publications/13051
%V 73
%X As a result of traffic congestion caused by sightseeing
and shuttle buses using park-and-ride parking lot near sightseeing spot,
the waiting time for tourist increases. In this paper, when bus parking
lot near sightseeing spot are overcrowded and full, a model for tourists
getting off a bus on a congested road and transfer to the sightseeing
spot by foot is proposed and verified. A model of getting off a bus on a
congested road when the sightseeing parking lot is overcrowded was
considered by the case analysis. As a result, effectiveness of the model
of getting off a bus on a congested road could be quantitatively
verified for times when parking capacity is exceeded and the bus
parking lot next to the sightseeing spot is overcrowded.
%P 12 - 18