Open Science Research Excellence
@article{(International Science Index):http://waset.org/publications/9664,
  title    = {Scheduling a Project to Minimize Costs of Material Requirements},
  author    = {Amir Abbas Najafi and  Nima Zoraghi and  Fatemeh Azimi},
  country   = {},
  institution={},
  abstract  = {Traditionally, project scheduling and material planning have been treated independently. In this research, a mixed integer programming model is presented to integrate project scheduling and materials ordering problems. The goal is to minimize the total material holding and ordering costs. In addition, an efficient metaheuristic algorithm is proposed to solve the model. The proposed algorithm is computationally tested, the results are analyzed, and conclusions are given.
},
    journal   = {International Journal of Mechanical, Aerospace, Industrial, Mechatronic and Manufacturing Engineering},  volume    = {5},
  number    = {6},
  year      = {2011},
  pages     = {968 - 971},
  ee        = {http://waset.org/publications/9664},
  url       = {http://waset.org/Publications?p=54},
  bibsource = {http://waset.org/Publications},
  issn      = {eISSN:1307-6892},
  publisher = {World Academy of Science, Engineering and Technology},
  index     = {International Science Index 54, 2011},
}