Simulation Modeling of Fire Station Locations under Traffic Obstacles
Authors:
Abstract:
Facility location problem involves locating a facility to optimize some performance measures. Location of a public facility to serve the community, such as a fire station, significantly affects its service quality. Main objective in locating a fire station is to minimize the response time, which is the time duration between receiving a call and reaching the place of incident. In metropolitan areas, fire vehicles need to cross highways and other traffic obstacles through some obstacle-overcoming points which delay the response time. In this paper, fire station location problem is analyzed. Simulation models are developed for the location problems which involve obstacles. Particular case problems are analyzed and the results are presented.
Keywords:
Public Facility Location, Fire Stations, Response Time, Fire Vehicle Delays.
2
13084
Modeling and Simulation of a Serial Production Line with Constant Work-In-Process
Authors:
Abstract:
This paper presents a model for an unreliable production line, which is operated according to demand with constant work-in-process (CONWIP). A simulation model is developed based on the discrete model and several case problems are analyzed using the model. The model is utilized to optimize storage space capacities at intermediate stages and the number of kanbans at the last stage, which is used to trigger the production at the first stage. Furthermore, effects of several line parameters on production rate are analyzed using design of experiments.
Keywords:
Production line simulator, Push-pull system, JIT system, Constant WIP, Machine failures.
1
10005396
Availability Analysis of a Power Plant by Computer Simulation
Authors:
Abstract:
Reliability and availability of power stations are extremely important in order to achieve a required level of power generation. In particular, in the hot desert climate of Kuwait, reliable power generation is extremely important because of cooling requirements at temperatures exceeding 50-centigrade degrees. In this paper, a particular power plant, named Sabiya Power Plant, which has 8 steam turbines and 13 gas turbine stations, has been studied in detail; extensive data are collected; and availability of station units are determined. Furthermore, a simulation model is developed and used to analyze the effects of different maintenance policies on availability of these stations. The results show that significant improvements can be achieved in power plant availabilities if appropriate maintenance policies are implemented.
Keywords: