Excellence in Research and Innovation for Humanity

ICCSET 2017 : 19th International Conference on Construction Scheduling, Equipment and Techniques

Barcelona, Spain
November 2 - 3, 2017

Conference Code: 17ES11ICCSET

International Research Conference Aims and Objectives

The ICCSET 2017: 19th International Conference on Construction Scheduling, Equipment and Techniques aims to bring together leading academic scientists, researchers and research scholars to exchange and share their experiences and research results on all aspects of Construction Scheduling, Equipment and Techniques. It also provides a premier interdisciplinary platform for researchers, practitioners and educators to present and discuss the most recent innovations, trends, and concerns as well as practical challenges encountered and solutions adopted in the fields of Construction Scheduling, Equipment and Techniques.

Call for Contributions

All honorable authors are kindly encouraged to contribute to and help shape the conference through submissions of their research abstracts, papers and e-posters. Also, high quality research contributions describing original and unpublished results of conceptual, constructive, empirical, experimental, or theoretical work in all areas of Construction Scheduling, Equipment and Techniques are cordially invited for presentation at the conference. The conference solicits contributions of abstracts, papers and e-posters that address themes and topics of the conference, including figures, tables and references of novel research materials.WASET

Conference Proceedings

All submitted conference papers will be blind peer reviewed by three competent reviewers. The peer-reviewed conference proceedings are indexed in the International Science Index (ISI), Google Scholar, Semantic Scholar, Zenedo, OpenAIRE, BASE, WorldCAT, Sherpa/RoMEO, and other index databases. Impact Factor Indicators.

Special Journal Issues

ICCSET 2017 has teamed up with the Special Journal Issue on Construction Scheduling, Equipment and Techniques. A number of selected high-impact full text papers will also be considered for the special journal issues. All submitted papers will have the opportunity to be considered for this Special Journal Issue. The paper selection will be carried out during the peer review process as well as at the conference presentation stage. Submitted papers must not be under consideration by any other journal or publication. The final decision for paper selection will be made based on peer review reports by the Guest Editors and the Editor-in-Chief jointly. Selected full-text papers will be published online free of charge.

Conference Sponsor and Exhibitor Opportunities

The Conference offers the opportunity to become a conference sponsor or exhibitor. To participate as a sponsor or exhibitor, please download and complete the Conference Sponsorship Request Form.

Important Dates

Abstracts/Full-Text Paper Submission Deadline   September 25, 2017
Notification of Acceptance/Rejection   September 30, 2017
Final Paper (Camera Ready) Submission & Early Bird Registration Deadline   October 2, 2017
Conference Dates   November 2 - 3, 2017

Important Notes

Please ensure your submission meets the conference's strict guidelines for accepting scholarly papers. Downloadable versions of the check list for Full-Text Papers and Abstract Papers.

Please refer to the Paper Submission GUIDE before submitting your paper.

Selected Conference Papers

1) A Construction Management Tool: Determining a Project Schedule Typical Behaviors Using Cluster Analysis
Natalia Rudeli, Elisabeth Viles, Adrian Santilli
2) Pre- and Post-Analyses of Disruptive Quay Crane Scheduling Problem
K. -H. Yang
3) Empirical Study on Causes of Project Delays
Khan Farhan Rafat, Riaz Ahmed
4) Solving Weighted Number of Operation Plus Processing Time Due-Date Assignment, Weighted Scheduling and Process Planning Integration Problem Using Genetic and Simulated Annealing Search Methods
Halil Ibrahim Demir, Caner Erden, Mumtaz Ipek, Ozer Uygun
5) Job Shop Scheduling: Classification, Constraints and Objective Functions
Majid Abdolrazzagh-Nezhad, Salwani Abdullah
6) A Fuzzy Mathematical Model for Order Acceptance and Scheduling Problem
E. Koyuncu
7) A Memetic Algorithm for an Energy-Costs-Aware Flexible Job-Shop Scheduling Problem
Christian Böning, Henrik Prinzhorn, Eric C. Hund, Malte Stonis
8) Intelligent Rescheduling Trains for Air Pollution Management
Kainat Affrin, P. Reshma, G. Narendra Kumar
9) Strategic Mine Planning: A SWOT Analysis Applied to KOV Open Pit Mine in the Democratic Republic of Congo
Patrick May Mukonki
10) Improving the Performances of the nMPRA Architecture by Implementing Specific Functions in Hardware
Ionel Zagan, Vasile Gheorghita Gaitan
11) Solving Process Planning and Scheduling with Number of Operation Plus Processing Time Due-Date Assignment Concurrently Using a Genetic Search
Halil Ibrahim Demir, Alper Goksu, Onur Canpolat, Caner Erden, Melek Nur
12) Solving Process Planning, Weighted Earliest Due Date Scheduling and Weighted Due Date Assignment Using Simulated Annealing and Evolutionary Strategies
Halil Ibrahim Demir, Abdullah Hulusi Kokcam, Fuat Simsir, Özer Uygun
13) CPU Architecture Based on Static Hardware Scheduler Engine and Multiple Pipeline Registers
Ionel Zagan, Vasile Gheorghita Gaitan
14) Non-Chronological Approach in Crane Girder and Composite Steel Beam Installation: Case Study
Govindaraj Ramanathan
15) Benefits of Construction Management Implications and Processes by Projects Managers on Project Completion
Mamoon Mousa Atout

Similar conferences about Structural and Construction Engineering