Excellence in Research and Innovation for Humanity

ICCSET 2017 : 19th International Conference on Construction Scheduling, Equipment and Techniques

Barcelona, Spain
November 2 - 3, 2017

Conference Code: 17ES11ICCSET

Conference Proceedings

All submitted conference papers will be blind peer reviewed by three competent reviewers. The peer-reviewed conference proceedings are indexed in the International Science Index (ISI), Google Scholar, Semantic Scholar, Zenedo, OpenAIRE, BASE, WorldCAT, Sherpa/RoMEO, and other index databases. Impact Factor Indicators.

Special Journal Issues

ICCSET 2017 has teamed up with the Special Journal Issue on Construction Scheduling, Equipment and Techniques. A number of selected high-impact full text papers will also be considered for the special journal issues. All submitted papers will have the opportunity to be considered for this Special Journal Issue. The paper selection will be carried out during the peer review process as well as at the conference presentation stage. Submitted papers must not be under consideration by any other journal or publication. The final decision for paper selection will be made based on peer review reports by the Guest Editors and the Editor-in-Chief jointly. Selected full-text papers will be published online free of charge.

Conference Sponsor and Exhibitor Opportunities

The Conference offers the opportunity to become a conference sponsor or exhibitor. To participate as a sponsor or exhibitor, please download and complete the Conference Sponsorship Request Form.

Important Dates

Abstracts/Full-Text Paper Submission Deadline   September 25, 2017
Notification of Acceptance/Rejection   September 30, 2017
Final Paper (Camera Ready) Submission & Early Bird Registration Deadline   October 2, 2017
Conference Dates   November 2 - 3, 2017

Important Notes

Please ensure your submission meets the conference's strict guidelines for accepting scholarly papers. Downloadable versions of the check list for Full-Text Papers and Abstract Papers.

Please refer to the Paper Submission GUIDE before submitting your paper.

Selected Conference Papers

1) A Construction Management Tool: Determining a Project Schedule Typical Behaviors Using Cluster Analysis
Natalia Rudeli, Elisabeth Viles, Adrian Santilli
2) Pre- and Post-Analyses of Disruptive Quay Crane Scheduling Problem
K. -H. Yang
3) A Mixed Integer Linear Programming Model for Flexible Job Shop Scheduling Problem
Mohsen Ziaee
4) Empirical Study on Causes of Project Delays
Khan Farhan Rafat, Riaz Ahmed
5) Solving Weighted Number of Operation Plus Processing Time Due-Date Assignment, Weighted Scheduling and Process Planning Integration Problem Using Genetic and Simulated Annealing Search Methods
Halil Ibrahim Demir, Caner Erden, Mumtaz Ipek, Ozer Uygun
6) Job Shop Scheduling: Classification, Constraints and Objective Functions
Majid Abdolrazzagh-Nezhad, Salwani Abdullah
7) A Fuzzy Mathematical Model for Order Acceptance and Scheduling Problem
E. Koyuncu
8) Strategic Mine Planning: A SWOT Analysis Applied to KOV Open Pit Mine in the Democratic Republic of Congo
Patrick May Mukonki
9) A Memetic Algorithm for an Energy-Costs-Aware Flexible Job-Shop Scheduling Problem
Christian Böning, Henrik Prinzhorn, Eric C. Hund, Malte Stonis
10) Solving Process Planning, Weighted Earliest Due Date Scheduling and Weighted Due Date Assignment Using Simulated Annealing and Evolutionary Strategies
Halil Ibrahim Demir, Abdullah Hulusi Kokcam, Fuat Simsir, Özer Uygun
11) Intelligent Rescheduling Trains for Air Pollution Management
Kainat Affrin, P. Reshma, G. Narendra Kumar
12) Improving the Performances of the nMPRA Architecture by Implementing Specific Functions in Hardware
Ionel Zagan, Vasile Gheorghita Gaitan
13) Solving Process Planning and Scheduling with Number of Operation Plus Processing Time Due-Date Assignment Concurrently Using a Genetic Search
Halil Ibrahim Demir, Alper Goksu, Onur Canpolat, Caner Erden, Melek Nur
14) CPU Architecture Based on Static Hardware Scheduler Engine and Multiple Pipeline Registers
Ionel Zagan, Vasile Gheorghita Gaitan
15) Non-Chronological Approach in Crane Girder and Composite Steel Beam Installation: Case Study
Govindaraj Ramanathan

Similar conferences about Structural and Construction Engineering